NEEPCO Recruitment for Apprenticeship Training, All India, Last Date – 20 August 2021
- Updated: July 30, 2021
- All India
- 0 Years
- Not Specified
Table of Contents - Job
Job Positions
- Graduate Apprentices
- Technician Apprentices
Job Details
Job ID / Advertisement No.
NEEPCO-01/2021-22
Job Category
Job Type
Full Time
Internship
Internship
Interview Locations
Not Mentioned –
Job Locations
Not Mentioned –
Number of Openings
94
Joining Time
Not Mentioned –
Desired Experience
0 Years
Salary
As per Company Standards
Job Description
North Eastern Electric Power Corporation Limited is a Schedule –‘A’ “Mini Ratna” Category-I Central Public Sector Enterprise under the Ministry of Power, Government of India. The Corporation is engaged in planning, designing & executing power projects of hydro, thermal & Solar and entering into Wind Energy Projects. The Corporation propose to engage 94 (Ninety four) apprentices for FY 2021-22 under the Apprenticeship Act 1961 for a period of one year apprenticeship training in the following trades for its different Plants/Projects/ Establishments
- Graduate Apprentice (BE or equivalent Degree in Engineering)
– Electrical
– Mechanical
– Civil
– IT
– Elect/ Mech - Technician Apprentice (Diploma in Engineering or Technology)
– Civil
– Elect/ Mech
– Electrical
– Mechanical
– IT
Important Instructions
Instructions to Apply
- Closing of online application (through NATS portal) – 20th August, 2021
- Last date of receipt of filled up applications form along with testimonials and documents via email – 10th September, 2021
How to Apply ?
Please read all job details clearly and apply exactly as mentioned below only if you meet eligibility criteria.
Last Date to Apply: 20/08/2021
Job Tagged in
North Eastern Electric Power Corporation Limited (NEEPCO)
About Company: NEEPCO has been a trusted power generation company in the North Eastern region of India and beyond since 1976, working closely with the Ministry of Power and the north eastern states to act in their best interest in tapping the enormous power potential of the region and the country.
We pride ourselves with:
operating the largest Hydro Power Plant in N.E. Region of India
being the only CPSU having Hydro and Thermal Power Stations in operation
having exposure to construction & operation of Hydro projects in highly difficult and Geo-Technically sensitive terrain of N.E. Region.
Incorporated in 1976 to plan, investigate, design, construct, generate, operate & maintain power stations in the North Eastern Region of India under the Ministry of Power, Government of India, NEEPCO is conferred with the Schedule A- Miniratna Category-I CPSE status and operates 7 hydro, 3 thermal and 1 solar power stations with a combined installed capacity of 2057 MW. NEEPCO commissioned its largest Hydro Project Kameng(600 MW) in the N.E. Region, Commercial operation of Unit-I (150MW) was declared w.e.f. 00:00 hours of 17.06.2020, Commercial operation of Unit-II (150 MW) was declared w.e.f. 00:00 hours of 01.07.2020, Commercial operation of Unit-III (150 MW) was declared w.e.f. 00:00 hrs of 22.01.2021 and Unit-IV was declared w.e.f. 00:00 hrs of 12.02.2021.
With its Corporate Office located in Shillong, the capital of Meghalaya, NEEPCO is equipped with a wealth of construction and operations experience and our human resource is committed to harness the huge power potential of the country with minimal impact on the environment.
We pride ourselves with:
operating the largest Hydro Power Plant in N.E. Region of India
being the only CPSU having Hydro and Thermal Power Stations in operation
having exposure to construction & operation of Hydro projects in highly difficult and Geo-Technically sensitive terrain of N.E. Region.
Incorporated in 1976 to plan, investigate, design, construct, generate, operate & maintain power stations in the North Eastern Region of India under the Ministry of Power, Government of India, NEEPCO is conferred with the Schedule A- Miniratna Category-I CPSE status and operates 7 hydro, 3 thermal and 1 solar power stations with a combined installed capacity of 2057 MW. NEEPCO commissioned its largest Hydro Project Kameng(600 MW) in the N.E. Region, Commercial operation of Unit-I (150MW) was declared w.e.f. 00:00 hours of 17.06.2020, Commercial operation of Unit-II (150 MW) was declared w.e.f. 00:00 hours of 01.07.2020, Commercial operation of Unit-III (150 MW) was declared w.e.f. 00:00 hrs of 22.01.2021 and Unit-IV was declared w.e.f. 00:00 hrs of 12.02.2021.
With its Corporate Office located in Shillong, the capital of Meghalaya, NEEPCO is equipped with a wealth of construction and operations experience and our human resource is committed to harness the huge power potential of the country with minimal impact on the environment.